RPZ Srebrna - 110/15 kV district supply substation

CLIENT

NEON Electrical Services Plant

LOCATION

Konstantynów Łódzki

YEAR

2023

+1

FQS metering cubicle installed

+2

new 15 kV bays installed
Challenge
The 110/15 kV Srebrna substation, commissioned in 2022, had only one 15 kV switchgear section with a limited number of feeder bays and could not accommodate all prospective customers. The rapid development of renewable energy sources—especially photovoltaic farms—forced the distribution company to expand the network. A decision was taken to build a second medium-voltage switchgear section to meet the new requirements. All work had to be carried out on an energised installation with very tight outage windows.
Solution
We extended the MV switchgear by installing Section 2. Two 15 kV bays, a bus-coupler bay with circuit-breaker, and a line bay dedicated to the photovoltaic farm connection were mounted. A cable bridge linked the new section with the existing switchgear, and the necessary control and metering circuits were installed. Comprehensive tests and commissioning were completed, including a new FQS cubicle for energy metering.

Summary

Expanding the MV switchgear to connect a photovoltaic farm in Konstantynów Łódzki was a relatively straightforward task. Thanks to the commitment and professionalism of our team at every stage—from design to on-site works—the project was completed well ahead of the contractual deadline. With future RES growth and city development in mind, the installation was executed to allow easy further expansion.